Five ways campuses pair on-site power with the grid

Most AI campuses still plan a grid connection. Five common ways to pair on-site generation with the grid, and what each means for buyers.

Most AI campuses that build on-site power still plan to connect to the grid, mainly because on-site power usually costs more. That is the finding of a recent a16z analysis, which sets out five common setups:

  1. Grid power with on-site backup. The grid serves daily load and gas is for backup.
  2. A bridge until the grid arrives. Temporary turbines run first.
  3. An on-site plant with a capped grid connection. The campus brings much of its own power.
  4. A plant next door, with the grid as backup.
  5. Islanded, with a grid connection later.

What this means for buyers

  • An island has to supply its own stability, and AI load swings make that harder.
  • Fuel must be reliably available, and air permits must match how the plant runs.
  • Speed can justify the cost: some buyers accept lower uptime to start sooner.

Our site

We plan on the grid as the primary supply. Backup and bridge options are still being assessed. See the site status page.

By Territory Holdings. Last updated October 30, 2026. This is general information, not advice.